You must follow the installation and maintenance guides to receive the utmost benefits/lifetime of your flooring.

Make sure you have sufficient cartons to get the job done, always add 5% for waste materials. Place the unopened packages of flooring in the middle of the room 24 to 48 hours prior to beginning installation. Usually do not open cartons until you are ready to begin set up To get the best appearance and utility; we recommend you randomly blend panels from numerous cartons.

Color Difference between person panels or packs are normal consideration in Normal Flooring, therefore to maximize appearance it is always smart to install the flooring in natural light (laying at night time isn't recommended). Cork and wood are both products of character. Difference in the structure, color, and patterns (actually in the same carton), are all part of the natural beauty of the material.

Cork or Timber Flooring is not suitable for damp and steamy areas.

Inspect all panels prior to installation. It really is your responsibility never to install defective panels.

All End-Joints of Panels ought to be staggered 8" from joints of the prior row

Much like all products from nature sunlight could cause color variations.

An expansion space of at least 3/8" can be used throughout, not merely between walls and various other flooring, but also around door frames, pipes, or other set objects. With a room size greater than 33'(planks laid length wise) or 26' (planks laid crossways), growth joints should be included. The buildings own expansion joints must be taken in consideration. These expansion areas can be protected with baseboard and/or trim.

Subfloor Specifications

The surface of the subfloor should be sound and level within 1/8" in an 8-ft. radius. The subfloor should be clean and dry.

Concrete subfloors must not contain more than 3-lbs. moisture (1.5 lbs. with radiant high temperature systems) on a dry-weight basis (calcium chloride check). Moisture content of hardwood subfloors should be between 6-10% Dampness Content (MC).

Relative humidity range at the job site ought to be 45% - 65%; Space Temperature setting should be between 65F-80F degrees.

Job Site Evaluation

Before installing inspect the job site thoroughly. Determine if the grade, subfloor and subfloor conditions are suitable. In homes with crawl places, foundation vents must provide cross ventilation with no dead atmosphere space. Vents should be located through the entire foundation with opening area equal to 1 ½% of the square region within the crawl space. If excessive wetness exists within the home, you must lay a 6-mil black polyethylene or foam underlayment dampness barrier (available for purchase on this site on the ground in the crawl space below the installation area.

Preparation

Inspect the subfloors to ensure they are appear and level

Hardwood subfloors: Inspect the wood subfloor to determine that it's sound and level. Make any needed repairs and remove or collection any protruding fingernails, staples or screws. Re-nail any loose areas or areas with squeaks. If the subfloor sags, inspect the joists below for twists or additional weaknesses and repair. Sand or plane any high areas, fill any low areas. At this stage, door jambs should be undercut to avoid tough cuts. Also ensure that you leave proper growth under door jambs.

Concrete subfloors: On or below grade concrete subfloors are usually acceptable if an effective moisture barrier is normally installed. Make sure that, as the very least, any concrete subfloor is at least 50-60 days old before installing a cork/wood floor over it. Check dampness content material by taping a 2-ft. x 2-ft. square of polyethylene film to the slab in three or four locations and, if possible, place a lamp or additional heat source over the poly every day and night or conduct a calcium chloride check. Signs of surplus moisture include: discolored concrete, cloudy film or real water droplets on the lower of the poly. Fill up any voids or low areas in the subfloor with a self-curing leveling compound. Make sure it really is fully healed before proceeding with the cork/ wood set up. 15-lb. Roofing paper can be appropriate for leveling minimal depressions in the floor. Cut to the shape of the major depression and stack in layers to level the area.

Other subfloors: Cork/Real wood Floors can be installed over a variety of existing floors including: vinyl sheet or tiles, rubber tiles, linoleum, terrazzo, ceramic tile, or other wood floors. The same leveling and dampness requirements apply and the prevailing floor must be sound.

Prior to begin laying CORK/Real wood Flooring in a below grade installation (basements, etc.) a 1/64" (0.2mm) polyethylene film should be laid Overlap the film by 6" and seal the seams with duck tape. Also, in below quality installations wrap the film up the wall structure.

Begin Laying

Measure the space, this allows you to determine if the last plank in the 1st row will likely be shorter that 12". If this is the case, the 1st plank in row ought to be shortened to increase the overall stability of the flooring.

If the starting wall is not straight, spacers or batten ought to be used to insure the first row is right. After laying the 1st three rows these spacers could be removed (however, you should always leave a 3/8" expansion space)

Lay the first plank in the proper corner of the area with tongue-side towards the wall. Do not forget to use spacer wedges along all walls or other fixed points in the room. Insert the finish joint of the second plank precisely into the end joint of the 1st plank. This purpose, it must be done at an angle of approximately 20°-30° lowering with light pressure the panel in place. Continue installing the initial row.

With the next row, start with the leftover piece of plank from the previous row if the plank reaches least 12" long (Note: Stagger end joints in adjunct rows by at least 8".. If not a new plank should be cut. Always keep up with the spacing from the wall structure. Using the leftover plank from the initial row, beginning on the proper, lower this plank set up at approximately 20°-30° angle with the one in the 1st row. Lower another plank in this row set up at the same angle. This who to hire for tile installation Augusta is achieved by lifting up leading aspect of plank by approximately (3"-4") - together with previously laid plank from the same row - then lay set up with slight pressure with the planks from the previous row. After the fitting the entire row, make use of a tapping block (lightly) to close any gaps between panels. Preceded with the laying row by row.

If you used spacers or batten to keep carefully the first row right, following the 3-4 row remove them, still leaving the required spacing on all walls. Make certain the spacing is kept around fixed points (walls, door frames, etc.). The flooring must float freely.

If you cann't engage the joints of planks under door frames, kick plates, etc. and pull bar can be used. Remove all the spacers and install all base boards and trims ensuring the floor can move openly underneath. Never attach bottom boards or trim right to the flooring.