1, glass cutting material: often the original goblet is generally colorless float glass or maybe other decorated glass, covering glass, toughened glass, laminated glass, this thickness is generally 3-12mm, the aforementioned cup must conform to the particular GB11614 first-class merchandise, superb product provisions, after passing the inspection can turn out to be used. Glass cutting can easily be done by means of hands or by machine, but it really should be guaranteed for you to meet the dimensions prerequisites. In this process, the operator should always pay attention to the floor of the glass, no chafes, uniform endoplasm, simply no bubbles, slag and other obvious problems.



2. Goblet cleaning plus drying: Device cleaning can be used for cup cleaning, for the reason that manual cleanup cannot guarantee the cleaning top quality. The a glass must turn out to be inspected without scrape in advance of cleaning. In order to be able to assure the adhesive in between sealant and glass, that is better to make use of deionized water. In addition, as a way to ensure water recycling plus save water resources, the can be television to ensure long-term use. Right after cleaning typically double glazed unit for you to light check up, evaluation a glass surface using or maybe with out water, liquid stains in addition to other stains, when there is liquid, water stains as well as other staining, you have the unit working speed, heating heat, air flow velocity, brush clearance adjustment, cleaning drying around order to achieve the perfect effect, wash and dried the glass should turn out to be within 1 hour or so after assemble into hollow wine glass, in addition to ensure that often the rubbing among glass plus glass avoid scratch, experienced better have semi-finished solutions store car cup, divides among glass plus cut.



3. Assembly of rubber strip insulating cup together with aluminum strip coating cup:



Rubber strip insulating a glass set up:

(1) The environmental prerequisites: The processing heat connected with rubber strip insulation cup should be between 10-20 certifications in winter plus over 20 degrees in summer.

(2) Requirements of comparative moisture: Since the cement adhesive type coating glass desiccant is in the sort of powder, and the desiccant takes on a slow position after it is evenly mixed with the particular adhesive, the relative wetness involving the adhesive strip construction area should be a little decrease.



Aluminum strip insulating wine glass Assembly:

(1) Ecological requirements: The temperature will need to also become between 10-30 degrees


(2) Relative humidity requirements: this specific insulating a glass has a slightly reduced requirement for relative humidness, which is acceptable underneath standard conditions. But that should be noted that often the desiccant have to select this qualified items of regular manufacturers to make sure typically the effective use of desiccant. It is better in order to use up the desiccant within 24 hours following opening, because the air permeability of polysulfide is greater, poor sealing, so to work with a good double seal. Butyl rubber as the first close, in order to block the function associated with gas. The use associated with polythioglue because the 2nd seal, the key role is definitely bonding, put into practice by gasoline isolation. Procedure has proven that the living regarding insulating glass for each unit production is only regarding 5 several years, and the particular living of insulating cup along with double channel seal is often as long as twenty years if not more than 40 years, as a result, the introduction of insulation glass with two times station seal is the craze of The Times.



four. A glass press

Rubber deprive protecting glass press have to take notice of the alignment of the particular edge of the glass. Throughout online Low-E , a smaller starting should be reserved on the back to let the dried up gas escape from this small opening up. After this press, it should possibly be enclosed immediately. So a long way, the control of rubberized material strip protecting glass features been accomplished. A travel time of 5-7mm should possibly be set between the surface part of the light weight aluminum frame and the glass edge of the aluminium club insulating glass. It really is used for applying the secondary sealant. The polythioglue should be uniformly spread alongside one part to avoid bubbles. So far, the processing of aluminum strip insulating glass has been recently completed.