ASTM A333 Grade 6 is just one of one of the most typically made use of low temperature steel pipes, its minimal service temperature is -70 ℃, typically in stabilizing or stabilizing as well as tempering problem. ASTM A333-GR6 steel has reduced carbon web content, exceptional low temperature toughness, plasticity and welding performance, and also little quenching and also cool breaking tendency. The low temperature toughness, namely the capability to prevent breakable failure from occurring and also increasing at reduced temperature, is one of the most essential aspect impacting its welding performance.

Typical welding methods for low temperature level steel include arc welding, immersed arc welding, argon arc welding and so on. MIG welding is one of the most widely made use of automatic or semi-automatic welding approach in low temperature steel welding. Its welding heat input is 23-40kJ/ cm. According to the mode of droplet transfer, it can be separated into short circuit transition process (low warmth input), jet change process (high warm input) and pulse jet shift process (the highest heat input). Short-circuit change MIG welding might have the issue of insufficient melting deepness or inadequate fusion. In order to make the arc more focused and also acquire adequate penetration depth, CO2 or O2 can be contributed to the pure argon protecting gas. The certain quantity of addition need to be determined according to the steel qualities.

Welding product

Welding materials (consisting of electrode, cord as well as change, etc.) will be picked according to the welding approach adopted, joint kind as well as groove shape and requirements. For low temperature steel, one of the most essential point to take note of is to make the weld steel have sufficient reduced temperature durability to match the base metal as well as lessen the hydrogen diffused in it. Usually, ER80S-Ni1 argon arc welding wire is made use of.

Welding procedure

In welding, I-Shape port is used for pipes with diameter much less than 76.2 mm, as well as full argon arc welding is executed. For the V-groove of pipeline with diameter more than 76.2 mm, argon arc backing as well as multi-layer dental filling are adopted, or full argon arc welding That's depends upon particular pipeline diameter and also pipe wall thickness.

( 1) Preheating prior to welding.

When the ambient temperature is less than 5 ℃, the steel pipeline should be preheated, and the preheating temperature level is 100 ~ 150 ℃. The preheating array is 100 mm on both sides of the weld; Heated by oxyacetylene fire (neutral flame), the temperature was gauged uniformly at a range of 50 ~ 100 mm from the weld center for much better temperature control.

( 2) Postweld warm therapy

In order to improve the notch toughness of cryogenic steels, a lot of steel tubes have actually been tempered and tempered, to make sure that post-weld warmth treatment is not typically needed for cryogenic steels, besides thicker weldments or in serious problems.

If unique components require to be heat dealt with after welding, according to the home heating rate, continuous temperature time and also air conditioning price of the warmth treatment after wldsteel.com welding, the following arrangements have to be purely carried out:

When the temperature level rises above 400 ℃, the heating price shall not go beyond 205 × 25/ δ ℃/ h, and shall not go beyond 330 ℃/ h. Constant temperature time ought to be 1 h per 25 mm density constant temperature level, and will not be much less than 15 min, optimum and also minimum temperature level throughout the temperature need to be less than 65 ℃. After continuous temperature level, the cooling price will not be more than 65 × 25/ δ ℃/ h, as well as will not be more than 260 ℃/ h, and all-natural cooling can be done below 400 ℃.

Tips for welding ASTM A333 Grade 6 tubes

( 1) Preheat purely according to the provisions, regulate the temperature in between the layers, the temperature between the layers is regulated at 100 ~ 200 ℃.

( 2) Strictly control line energy, tiny current, reduced voltage, quick welding.

( 3) full penetration procedure have to be embraced, and the operation mode of brief arc and no swing.

( 4) The residual height of the weld is 0 ~ 2mm, and the size of each side of the weld is much less than 2mm.

( 5) Nondestructive testing can be carried out a minimum of 24 hours after the appearance examination of the weld is qualified.

d6qecme487