from web site
A permit is required if you are preparing to remove or move a tree on your business or house. To get a permit, you need to submit a completed Application for Tree Removal or Relocation to the City's Planning and Economic Advancement Division. It is very important to remember, that the submission of the application does not authorize the removal of trees.
Must you desire to discuss your application prior to submittal, please set up a conference with the City Arborist by emailing or calling 954-392-2100. Please bear in mind the Arborist is in the field performing evaluations throughout the day and may not be readily available without visit. might be submitted via US Mail or hand delivery.
Dodge City Center Planning and Economic Development Department 601 City Center Method 3rd Flooring Pembroke Pines, FL 33026 Hand provided applications can be received Monday through Thursday in between the hours on 7am and 530pm. 1. Applications need to be signed and completely completed. 2. Should include a letter of approved action from the house owners association when relevant.
Need to consist of a sketch or location map along with the number of trees slated from removal/relocation. 4. Need to include a minimum of one color photo of each tree being looked for. 5. A check or cash order,, with appropriate costs (non refundable): Removed Single Family Multi-Family or Commercial for each extra tree.
In person; fees might be submitted by cash, check, money order or by means of * Charge Card (* additional Charges may apply). 6. A copy of the notification of code infraction if relevant. 7. Read This might be performed till the application is approved. 8. All candidates must contact Sunshine-811 by dialing 8-1-1 to have actually the residential or commercial property marked from underground utilities.
Application will receive a determination of approval or denial by means of United States Mail after the evaluation happens. If a tree is gotten rid of, a replacement needs to be installed within 30 calendar days. A second inspection will take place a minimum of 90 calendar days after the issuance of the authorization to make sure compliance with the terms of the permit.