Facade Specialists


With increasingly more high rise buildings appearing all above the world, substantial rise building washing has become extra and more essential. Exterior works an excellent source of rise building include high rise window cleaning, exterior wall membrane cleaning, curtain wall clean, high-rise outdoor wall paint, tangible repairs, sealing and aerial advertising unit installation etc. The content mainly introduces the particular suspended platform (swing stage) application upon the high rise building facades cleanup, and its positive aspects than BMU and even Bosun's chair.

Based on the characteristics of high-rise building, the major equipments that will be used in exterior wall cleaning include three kinds since below:

1. Making Maintenance Unit, also is called BMU
2 . Temporary Suspended System or Swing phase
3. Bosun's chair

The BMU is actually a special equipment intended for exterior wall washing of high-rise making. Its main use is cleaning outdoor wall of modern day high-rise building, which replace the traditional halted work operation in to automatic, efficient, substantial quality mechanical operation. It is the particular latest generation of powerful exterior wall membrane cleaning robot, in addition to fills up the blank from household to overseas inside of high-rise building external wall maintenance. Within China, some of older high-grade constructions, which often were built within 80-1990s, were made by foreign designers and they got considered the set up of BMU since then and implemented abroad BMU in order to maintenance building. These efforts have put a good base for building cleaning. But since 1990s, at this time there are many buildings had not deemed the using BMU when they had been designed and a few of them can not really be installed BMU, at the identical time, BMU will not belong to regular products and also generally bring more expensive, all of those prospect to BMU provides not been extensively used nowadays.

Since of Bosun's Chair's flexibility, it features been widely adopted in the planet. Nevertheless , as the risk in operation in addition to often brings mishaps, the Bosun's Seat has been even more and more substituted by suspended function platform. We think this is a tendency of development. Now, throughout China, many urban centers have already stipulated that will in aerial work cleaning, workers must use suspended work platform and restrict to work with Bosun's Couch, in order to avoid more injuries happening.

The revoked work platform will be a new type of aloft working machinery. Because of it's operate efficiently, comfort, safety, strength saving etc, it is often widely used inside domestic decoration and cleaning industry.

The particular main materials regarding exterior wall incorporate glass curtain wall, Aluminum composite plate, marble, granite, mosaic, ceramics, drying sticky stone, granitic plaster stone etc. Due to the dust, grease and chafing due to acid rainwater (fog), the latest buildings become smudgy easily in other words period, especially in a few serious air air pollution cities.

According to be able to the weight-bearing ability, the suspended job platform can get broken into 1000kgs, 800kgs, 600kgs, 500kgs and 250kgs etc. Based to the duration of platform, it consists of 10m, 7. 5m, 6m, 4m, 2m and so on. The size of platform could be assembled to go well with several requests. Now the main types that are usually applied in cleaning industry include swing period ZLP630 and ZLP250 and the duration ranged from 6 in order to 10 meters is definitely more popular.

Preparation work before structure

1. Check the do the job site and promise the plan. Examine the roof condition and ensure that it might be installed suspended work platform and sure the motion has no hurdle like neon signals and billboard. The engineers design building plan.

2. In order that the construction environment without having wind, snow plus high temperature, small temperature phenomenon. Typically https://ropeaccessspecialistsuk.co.uk/best-rope-access-facade-specialists-greater-london/ in web-site should less compared to 6 levels.

a few. Prepare cleaning resources like bucket, marker, towels and sucker etc .

4. 2 workers carry cleanup tools, get in to platform cradle and even fasten safety devices.

Do safety assessment before operation.

1. To check typically the each parts inside of suspended work platform(swing stage), for assessment, if the fasteners, fittings, hoister, and safety protection equipment in good state and confirm zero hidden dangerous ahead of work.

2. To be able to check if the suspension system mechanism installed on roof structure, fasteners, drawing string are firm and confirm no invisible trouble functioning.

3. To check the size of safety rope and discover if there were any damage or even broken stocks upon it.

4. Fixed the safety rope and confirm the length is more than building height.

5. To check on the particular insurance belt worker used no harm.

6. To examine if the safety locking mechanism are flexible plus reliable.

7. To check if typically the fixed position in which the safety string joined on the side setting up is firmly.

8. To check in the event that the staff dresses satisfy the following needs: wearing a helmet and wearing fully sleeved work jacket plus long pants. Inside of corrosive environment, let workers wear corrosion-resistant clothes and shoes and boots with soft bottom level, which also top features of corrosion-resistant.

9. To check if the junction involving safety rope and building parapet provides the liners. If identified no, we should be stop working immediately.

10. The employee's self-lock system installed on insurance plan belt should end up being knotted on basic safety rope, not buckle in suspended system.

11. Please arranged up the fence in operation area and arrange one ground security official to preventing pedestrians. If no safety measures officer or safeguarding fence, we need to prevent the work. 13. Check the frame of mind of workers which operate in best of buildings, when incorporate some problems, stop working.

Operation procedure

1. Use drinking water gun to scrub sides and remove dirt.

2. Dip spreader into barrels plus after it fully absorb sanitizer, we all smear evenly on top of glass. Down the road wiper scrape goblet up and lower including window frame and corners. Ensure to pull crossly with no miss some little place and then use towel dry out it.

3. Following finishing one location, allow platform shift to the beneath site then when ending the cleaning through top to bottom part, we turn left or right to adjacent position and keep on to work from top to bottom again.

4. After finishing total operate, sorting machines in addition to tools and take out fences and billboard and clean the particular water on surface.

5. Cleaning plus maintenance equipments and after removing dust particles and dirt we all pack the device in warehouse.