f the subgrade is dry, the stabilization contractor will often flood these areas with water to avoid the possibility of this dryness pulling excess water from the treated material, retarding proper hydration of the lime and cement, and causing early failure of the section, such as longitudinal cracking or differential expansion along contact areas.